Cookie-Policy

In order to provide you with the best possible service, our website uses cookies. By using our website, you agree to the use of cookies. Further details are available in our Privacy Policy.

externer link Kalender icon Group 12 NEWS ICON NEWS ICON
Products
Downloads
Building Drainage
  • POLO-KAL XS
  • POLO-KAL NG
  • POLO-KAL 3S
  • Fire protective collar
  • Cleaning Pipe
Building ventilation system
Siphonic Roof Drainage
Pipe ducting system
Supply Systems
  • Drinking Water Pipe Systems
  • Cooling & Air Conditioning Pipe System
Water & Waste Water Discharge
  • Sewage pipe system
  • Storm water pipe system
  • Cleaning pipe
  • Bridge drainage
Compounding
References
Company
Lines of Business
Management
Corporate culture
Corporate history
Branch Network
People
Working at POLOPLAST
Apprenticeship
Career & Jobs
News
Contact
Headquarters
Service & Sales
  • Sales Team
  • Application technology
  • Sales Team Compounding
Our Company
Choose your language
Deutsch
English
Français
Poloplast
  • Products Products
    Building Drainage
    • POLO-KAL XS
    • POLO-KAL NG
    • POLO-KAL 3S
    • Fire protective collar
    • Cleaning Pipe
    Building ventilation system
    Siphonic Roof Drainage
    Pipe ducting system
    Supply Systems
    • Drinking Water Pipe Systems
    • Cooling & Air Conditioning Pipe System
    Water & Waste Water Discharge
    • Sewage pipe system
    • Storm water pipe system
    • Cleaning pipe
    • Bridge drainage
    Compounding
    References
  • Company Company
    Lines of Business
    Management
    Corporate culture
    Corporate history
    Branch Network
  • People People
    Working at POLOPLAST
    Apprenticeship
    Career & Jobs
  • News News
  • Contact Contact
    Headquarters
    Service & Sales
    • Sales Team
    • Application technology
    • Sales Team Compounding
    Our Company
  • EnEn
    Choose your language
    DeutschEnglishFrançais

POLO-ECO plus PREMIUM

BRIDGE DRAINAGE
In addition to its use in hydraulic structures for sanitary engineering, POLO-ECO plus PREMIUM is also successfully used in bridge drainage systems. Its high longitudinal stability and the wide distances between assembly points that result from it, its guaranteed resistance to UV radiation in conjunction with innovative special-purpose moulded parts, ensure the technical and economic optimisation of these infrastructure projects.
DOWNLOADS THE COMPANY back

THE ADVANTAGES OF POLO-ECO plus PREMIUM

BEWARE THE

HIGH TENSION

Very high longitudinal rigidity - for suspension spacings between 10 x DO to a maximum of 3.00 m.

STAYS

IN SHAPE

The small coefficient of linear expansion of 0.044 mm/m°K gains up to 12 m of distance between the fixed points.

INNOVATIVE

CONNECTION

POLO-TC (TOP-CONNECT) socket system - the ideal compensation for linear expansion.

PRECIPITATION?

NO PROBLEM!

The smooth inner surfaces of the pipe prevent precipitation and encrustation and can therefore increase maintenance and cleaning cycles.

UV =
RESISTANT

POLO-ECO plus PREMIUM has been developed and designed to be resistant to UV radiation and other atmospheric influences. Thus, its longstanding technical functionality and leakproofness can be guaranteed. This is an essential prerequisite in bridge drainage. The refurbishment cycles of bridge structures are usually between 25 and 30 years. This requirement is completely met by the POLO-ECO plus PREMIUM pipe system with its resistance to UV radiation of up to 30 years (depending on the assembly situation).

BIG MOUTH,
BUT SHUT TIGHT

Very easy maintenance, inspection and cleaning of pipes - no problem, if the cleaning pipe POLO-EHP control is used. It is available in the dimensions DN/OD 110 to DN/OD 500 and, in conformity to the system, is made from polypropylene; it is the perfect supplement to POLO-ECO plus PREMIUM pipe system - ideally suited for a wide range of applications.

INNOVATIVE VALUE ADDED
pipe system

REFERENCES

Steyr Viaduct, Pyhrn Motorway

Klaus . Austria

Product: POLO-ECO plus PREMIUM 12, DN 315 and DN 400
Length of the structure: 278 m
Construction period: 2013 to summer of 2015

F 45 Ramp 3 Overpass

Grünbach . Sandl . Austria

Product: POLO-ECO plus PREMIUM 12, DN 75–200
Length of the structure: ca. 275 m 
Construction period: 2014 bis 2015

A2 Südautobahn Motorway

Wien Modriach to Steinberg . Austria

Product: POLO-ECO plus PREMIUM 12, DN 200–250
Length of the structure: 1.070 m
Completion: 2015

F 48 Feldaistbrücke Bridge

Freistadt Nord . Austria

Product: POLO-ECO plus PREMIUM 12 in DN 110–400
Length of the structure: ca. 500 m
Construction period: 2014 bis 2015

A company of Wietersdorfer
A company of Wietersdorfer
  • Imprint
  • Privacy Policy
  • Security
  • GTC
  • GPTC